// Guides
Migrating Legacy Systems Without Source Code: Schema Reconstruction, Sec. 69e UrhG & 1:1 Parity Proof
Business-critical ERP, inventory, and specialist applications built in Delphi, Visual Basic 6, COM/ActiveX, or .NET frequently remain in production for 15+ years long after original vendors or source repositories have disappeared. Replacing them with ad-hoc migration scripts invites silent financial drift from hidden SQL contracts, legacy codepages, and binary floating-point rounding errors. This guide outlines a structured engineering path from legal authorization to cryptographically signed parity proof.
Updated: 2026-11-20
Immediate steps
- 1Document written authorization and statutory scope (Sec. 69d / 69e UrhG): Legal counsel confirms applicability for error correction or interoperability engineering ahead of work, and owner/client sign a hash-pinned intake authorization covering every artifact submitted.
- 2Prepare GDPR Art. 28 handover and pre-transfer anonymization: Mask personal production records or extract agreed synthetic test subsets using a pre-transfer checklist. All technical analysis runs inside an air-gapped offline laboratory without public cloud or third-party SaaS egress.
- 3Inventory binaries, UI forms, and database containers (Stage 1 Feasibility Check): Static inspection of compiled executables, DLLs, COM TypeLibs/IDL, Delphi DFM forms, and Firebird/dBASE/Access/SQLite files establishes reconstructability and transparent analytical boundaries in 5–10 working days.
- 4Extract embedded database schemas and SQL/ORM contracts (Stage 2 Reconstruction): Automated static analysis surfaces hardcoded queries, write paths, implicit foreign-key rules, and legacy character encodings while redacting embedded connection credentials at extraction time.
- 5Run fixed-point schema mapping & differential 1:1 parity verification (Stage 3): Financial, tax, and stock aggregates are reconciled using exact fixed-point arithmetic (rather than binary float/double) over agreed test datasets to expose rounding or truncation defects ahead of cutover.
- 6Deliver cryptographic sign-off bundle with offline verifier: Per-key diff reports and exact totals are anchored via a deterministic SHA-256 hash chain and signed with Ed25519 so management and auditors can verify parity offline at any time.
What not to do
- Never execute an ad-hoc ETL cutover of decades-old tables before mapping SQL constraints hidden inside compiled binaries.
- Never rely on row-count matching or floating-point sums to validate accounting, tax, or inventory migrations.
- Never commence decompilation or binary interface recovery without written owner authorization and documented statutory limits.
- Never transfer unmasked production dumps or plaintext connection credentials to third parties or external cloud tools.
When professional help makes sense
SKOPION Intelligence delivers the structured three-stage legacy analysis track — Stage 1 fixed-price Feasibility Check (5–10 working days), Stage 2 air-gapped Interface & Schema Reconstruction, and Stage 3 SHA-256/Ed25519 1:1 Parity Proof — vendor-neutrally and with documented boundaries.
// ZERO-SOURCE · LEGACY ANALYSIS, MIGRATION & EU CRA
Reconstruct Grown Legacy Systems & Prove 1:1 Migration Parity Without Source
Delphi, VB6, COM, .NET, old databases, or firmware lacking source code: inside our offline laboratory we deliver a 5–10 day feasibility dossier (Stage 1), reconstruct interfaces, compile CycloneDX 1.6 / OpenVEX binary SBOMs, and anchor 1:1 parity with SHA-256 & Ed25519.
Common questions
- When should teams start with a Stage 1 Feasibility Check?
- Whenever original source repositories, documentation, or maintainers are missing. Within 5–10 working days Stage 1 establishes what interfaces and database contracts can be recovered directly versus where obfuscation creates analytical limits — ahead of committing full replacement budgets.
- Which legacy application and database stacks are covered?
- Core coverage spans compiled Delphi (DFM/VCL), Visual Basic 6, COM/ActiveX (TypeLib/IDL), C++, and .NET executables plus dBASE, MS Access, Firebird, SQLite, SQL DDL, and embedded SQL/ORM contracts.
- How do statutory interoperability rules (Sec. 69e UrhG) apply in Germany and the EU?
- Sec. 69e UrhG (implementing the EU Software Directive) permits decompilation strictly to recover interface information indispensable for interoperability of an independently created program under defined conditions. Your legal counsel retains final sign-off on applicability.
- How is migration equivalence proven without risking floating-point errors?
- Stage 3 reconciles agreed test sets and records key-by-key using exact integer/fixed-point arithmetic and seals test evidence under a canonical SHA-256 hash chain with an Ed25519 signature and offline verification script.